Aker BP installs Hod B topsides for 2022 production
Description
Aker BP and fixed facilities alliance partners Aker Solutions and ABB advanced the operator’s plan to bring Hod field on stream in first-quarter 2022 with the installation of the 2,000-tonne topsides on the Hod B jacket, which was installed in July.